From the first sketch to the last working drawing
- 80+
- Drawing sets issued
- 4–6 weeks
- Avg. design cycle
- Unlimited to freeze
- Revisions included
Most delays on site begin as a drawing problem. We design the architecture, structure and services together from concept stage, so the drawings that reach site are already coordinated. Vastu is resolved during planning rather than patched afterwards, which is the only way it can be done without compromising the plan.
What you receive
- Site analysis & feasibility note
- Concept plans and 3D massing
- Vastu placement report
- Approved floor plans, elevations and sections
- Structural coordination drawings
- Complete working drawing set
- Door, window and finish schedules
- Photorealistic exterior and interior views
Capabilities
Concept & massing
Site study, setbacks, sun path and the first three-dimensional idea of the building.
Vastu-aligned planning
Direction-wise placement of entrance, kitchen, master bedroom and services resolved in the plan itself.
Elevation & material design
Facade composition, material palette and detailing developed to a buildable level.
Working drawings
Dimensioned plans, sections, details and schedules — the full set your site actually needs.
3D visualisation
Photorealistic views so you approve what you will actually get.
Approval drawings
Submission-ready drawings for municipal and JDA approvals.
Process
Brief & site study
We measure the plot, study sun and wind, and record exactly how you want to live.
Concept & Vastu
Two or three planning options, each resolved against Vastu placement.
Design development
The chosen option develops into elevations, sections and 3D views.
Coordination
Structure and MEPF are overlaid and every clash is resolved on paper.
Working drawings
The full construction set is issued, along with approval submissions.
Proof
Questions
Also from us
Next step
Start with an estimate, or book a free consultation and we will scope it properly.



